ゆりかもめ

Company Overview

Business Outline

Company Name Yurikamome Inc.
Name of Line Tokyo Waterfront New Transit Waterfront Line
Section Shimbashi to Toyosu
Total Length 14.7km
Number of Stations 16 stations
Structure Double-track, elevated structure (7.5m in width)
Structure Lateral guidance
Power Source Three-phase AC 600V (rigid double trolley)
Duration 31 minutes
Capacity 306~338 people(6-carriage train)
Operation Method Automated transit system with no on-board drivers
Average Daily Passengers About 133,000 people
Opening Date November 1, 1995